skip to main | skip to sidebar

lightfoot

A Modular Efficiency Dwelling for the Keweenaw Peninsula, Michigan

Interior walls

The interior walls go up before installing the roof trusses. The concrete block section shown here is for the Trojka wood stove.

Newer Post Older Post Home

Blog Archive

  • ▼  2009 (17)
    • ▼  March (17)
      • The Lightfoot concept...
      • The Lightfoot model
      • Selecting a site to build a prototype
      • Prefabricating the modules...
      • Setting the foundation
      • Transporting the modules
      • Installing the floor modules
      • Starting the wall module installation
      • Interior walls
      • Raising the roof
      • End-walls
      • Tyvek moisture barrier
      • Roofing
      • Windows and doors
      • Trojka 3-in-1 stove
      • Interior siding
      • Exterior Siding